Work through the tabs in order. Everything the engine produces is a draft — you review, edit and approve it. Each step needs the previous one, so the report will only write once the risk & control matrix has been tested.
- 1Audit universeBuild the list of things that can be audited
- Pick the module you are auditing (SAMA, PCI DSS, ISO 27001…) using the module switcher at the top.
- Press “Draft audit universe” to let the engine group the module’s measures into auditable entities, or add entities yourself.
- Review each entity, adjust the risk scores (1–5) and the owning department, and delete anything that does not apply.
Result: A scored, deduplicated list of auditable entities for the year.
- 2Annual planTurn the highest-risk entities into engagements
- Enter the audit days you have available for the year.
- Press “Draft annual plan” — the engine schedules the riskiest entities across quarters within that capacity.
- Edit titles, objectives, scope, out-of-scope, quarter and lead auditor, then save the plan.
Result: Approved engagements, each with objective, scope and a quarter.
- 3Data roomRequest and collect evidence (PBC list)
- Select the engagement.
- Press “Draft evidence requests” to generate the prepared-by-client list, or add requests manually.
- Give every request an owner and a due date, upload the documents received, and mark each one sufficient or insufficient.
Result: A complete evidence file with owners, dates and sufficiency decisions.
- 4ExecuteDraft and test the risk & control matrix
- Select the engagement and press “Draft risk & control matrix”.
- For every line, read the test procedure and the evidence required, then record the test result (effective, partial, exception).
- Add tester notes — these become the workpaper record and feed the report.
Result: Tested controls. The report cannot be written until this step is done.
- 5FindingsRaise the findings
- Press “Draft findings” to convert failed and partial tests into structured findings, or add findings manually.
- Check the condition, cause, effect and recommendation, and set the rating.
- Assign an action owner, a target date and record the management response.
Result: Rated findings with agreed management actions.
- 6ReportProduce the audit committee report
- Select the engagement — the list shows how many tested controls and findings each one has.
- Press “Draft audit report”. If nothing happens, the engagement has no tested controls yet: go back to Execute.
- Review the opinion and every section on screen, then download it as PDF or Markdown.
Result: An audit-ready report, drafted by the engine and approved by you.
- 7Follow-upChase the actions to closure
- Track outstanding, overdue, closed and risk-accepted actions.
- Update owners, target dates and status as the business responds.
- Draft a follow-up memo for escalations, owner reminders and the committee update.
Result: Evidence that findings were tracked to closure.
- 8MaturitySee how strong the control environment is
- Maturity is calculated from your test results and open findings — nothing to enter.
- Use the weakest-engagement list to shape next year’s universe scoring.
Result: A 1–5 maturity picture per engagement and overall.
- 9AgentsOptional helpers
- Run the regulation parser, control de-duplicator, evidence classifier, maturity scorer or workpaper writer on a chosen engagement.
- Every run is recorded with its inputs, outputs and who triggered it, so the trail stays auditable.
Result: Drafted content you review before using — never applied automatically.
If something will not generate
- Make sure you are signed in — the engine only runs for signed-in users.
- Make sure a module is selected; the tabs only show that module’s work.
- Findings need tested controls, and the report needs findings or tested controls. Do the earlier step first.
- If the engine is busy, wait a moment and press the button again.